Executive commissioning playbook
Messer CNC Xcel with Hypertherm XPR300 - Katy startup sequence
Pre-energization package

Commission the machine by gates, not by guesswork.

This guide turns the technical package into a clear field sequence: document control, LOTO release, grounding, gases, controls, safety, motion, XPR readiness, first arc, and closeout.

Primary hold DLRO + utilities
Ground target < 0.1 ohm
Release state Controlled
Messer CNC gantry and HMI as-left view
As-left machine and operator area
Open drag chain with orange conductors
Drag-chain routing evidence
Open electrical enclosure near Hypertherm-branded equipment
Power and interface area
Gate 01

Document Control

Load the commissioning gate.

Commissioning gate visual evidence
Evidence image

Executive decision

Decision pending.

Field actions

    Required evidence

    Evidence pending.

    Hold condition

    Hold pending.

    Commissioning Gate Map

    Gate 1Documents
    Gate 2LOTO release
    Gate 3Visual inspection
    Gate 4Grounding DLRO
    Gate 5Gas and air
    Gates 6-9Panels and limits
    Gates 10-12Control, safety, motion
    Gates 13-15XPR, first arc, closeout

    Evidence Wall